Last Thursday, the steering committee overseeing the Lake Oswego transit alternatives analysis got an update on the evaluation of alternatives. I’ll hit the highlights below, but the full presentation is here (PDF, 3M). There are also some visual simulations that I will post later when I receive them.

To get involved in the process, you can attend two open houses next week, and a formal public hearing on July 16th. Details are on our calendar.

slides_Page_1

slides_Page_2

slides_Page_3

The first interesting piece of data in the evaluation is that Streetcar has the best travel times among the alternatives due to the availability of dedicated right-of-way. Even with queue-jump lanes at intersections, BRT gets stuck in congestion on Highway 43.

In fact, Streetcar travel times are better than auto travel times, even with the more conservative total travel time measure (versus in-vehicle time). This is one of the few corridors in the region where transit beats autos on total time.

There is an interesting question the steering committee will need to grapple with that doesn’t appear on the slide. If the alternative chosen is to run in Macadam through Johns Landing – avoiding the political challenge of running next to the existing condos and likely contribution to a higher development potential – the price is several minutes in travel time.

slides_Page_4

slides_Page_5

Streetcar also appears to have the highest potential ridership.

slides_Page_6

There is a very unfortunate conflict developing between Streetcar and a trail in the same corridor. The critical pinch point is the tunnel through Elk Rock, which is not wide enough to accomodate the Streetcar and the trail (it’s barely wide enough for one Streetcar track). Since there is no practical way to run the trail over or around Elk Rock, a poor set of choices are left:

  • Abandon the Streetcar and get a relatively inexpensive trail, but ONLY if it turns out that the easements will hold up legally without rail use – a very debatable question. This option also abandons the $50M value of the right-of-way as a potential match against Federal funding for a rail project.
  • Bore a very expensive additional tunnel through the Elk Rock.
  • Put Streetcar stops at either end of the tunnel and let hikers and bikers board for the segment under the rock.

Yuck all around.

slides_Page_7

While Streetcar has higher initial capital costs, lower operating costs make it less expensive than BRT over a 20 year horizon.

slides_Page_8

One of the questions the Metro Council posed is whether it would be more effective to reach Lake Oswego via an extension to the Milwaukie LRT line. A very preliminary analysis suggests that capital costs would be higher and ridership would be lower. However, operating a DMU-type commuter rail service on the existing rail bridge may have some potential.